Lab #8: Wiring The Send Greg Line
Lab Date: March 11 , 2005
Due Date: March 21, 2005
Date Posted: March 8 , 2005
Lab Link: http://www.wadanet.com/hasegawa/book212/lab8.htm
Description:
Wire The SDG Line
What We Need To Make:
The Challenges:
This lab took the longer than any toher lab before it. Looking back, however, the difficulties that I encountered were not from the lab itself (except for a MAJOR one), but with the timming of my device.
To start off, I copied my design from lab 7 and wired it according to the labratory. It didn't work. After starting from scratch several times, I realized I was getting no where with my design. I set it aside for a few days.
Several Days Later...
After discovering what may have been the problem with the timming of my processor (mentioned back at the end of lab 6), I went back and fixed the delay on serveral devices. This fixed the hack-job timming that I had caused, and it was running with a degree of stability.
I went back and tried again. Still, it did not work. However, while I was working on it, I noticed something odd about our the program I had run. I had some of the numbers wrong. I went back and changed the program and this what I came up with:
The only difference is where ABCD is read and written from. Instead of 100/101 it was changed to 004/005. I tested it out, and it worked fine. Eureka!
Difficulty Rating (out of 5):
This lab would've have been easier if I had read the instructions VERY carefully.
( 3 out of 5)